Axis Mundi Kickstarter Construction Progress

October 23rd, 2020 Photo Update:
These photos were taken October 23rd, 2020. The sequence begins on the second-floor where apartments #1 and #2 are located. Apartments #3 and #4 are located on the first-floor. The images begin with entering the stairway to the third-floor and ends with the fourth-floor rooftop view of San Miguel de Allende. The image tour is organized in logical walking sequence with a 360 dgree capture of the spaces as one progresses along.